|
|
PT6 FLAT RATE LABOR CHARGES
| HOT Section Inspection | $2400.00 |
| Borescope Inspection |
$300.00 |
| 100 Hr Inspection |
$375.00 |
| 100 Hr with Nozzles |
$675.00 |
| 100 Hr (Ram Air) |
$450.00 |
| 100 Hr with Nozzles (Ram Air) |
$750.00 |
| Fuel Nozzles Cleaned & Flow Tested |
$375.00 |
| Exhaust Duct Change - Small |
$600.00 |
| Exhaust Duct Change - Large |
$900.00 |
| Spilt at "C" Flange |
$375.00 |
| Prop Shaft Seal Change with Prop |
$750.00 |
| Prop Shaft Seal Change |
$450.00 |
| Compressor Wash |
$300.00 |
| Turbine Wash |
$300.00 |
| Prop Balance |
$225.00 |
| Engine Change - Air Tractor |
$2100.00 |
| Engine Change - Thrush |
$2400.00 |
| Eddy Current Inspection |
$565.00 |
|

|
|
 |
 |
Site Hosted By... ®
© Copyright by Sandhills Publishing Company 2010.
All rights reserved. Reproduction of material appearing on this Web site
is strictly prohibited without written permission. Controller, Executive Controller, and Charter Hub are registered trademarks of Sandhills Publishing Company.
|
|